Packaged checks must identify the reference executable and its libraries, as well as its Git checkout. This audit found a stale HIP server while preparing fresh R9700 tests. The existing version gate rejected it before model loading. The portable evidence preserves that failure, the earlier diagnostics and the reference rebuild.

Reference identity correction#

The HIP server with SHA-256 5bc83033fc32c0752f8b00469de7b9d1ad4acb8da132fbe52ee1607e52986bbc reports revision b96806d96. Its checkout is at the intended policy revision, 5f436dddb440a288ee5611d7d1eca564a6aca9f4. The older reports correctly recorded the executable hash, but their claim that this HIP executable verifies the policy revision is withdrawn. Its recorded continuations remain diagnostics against those exact reference bytes. They cannot qualify the intended reference. OpenCode fixture outcomes and ZINC's own before/after comparisons are separate observations and retain their recorded scope.

Building a missing llama-tokenize also replaced sibling shared libraries while leaving that server executable unchanged. Reconfiguring and building both tools produced a server that reports the intended revision. Both pre-build and post-build hashes are retained; the rebuilt tools require fresh model checks.

The candidate and worker-readiness harnesses now snapshot both executables and all sibling ggml/llama libraries before model checks. They refuse success if any of these files changes. Published reports contain only library basenames and hashes. Candidate aggregation requires at least one ggml library in that inventory. Reference builds must include their ggml libraries beside the tools.

Installed ZINC runs with inherited model and library overrides removed. Reference processes explicitly select their own sibling libraries. The reference's library search path is kept out of ZINC's execution environment.

Native reference backends#

The initial test of the unsigned main preview 9eb380e0 used the pinned Vulkan reference for both ZINC backends. Ten of twelve model/backend rows passed. Its ROCm MoE row disagreed on “fridge” versus “box”; the Vulkan reference's logprob gap was about 0.091, above the allowed 0.05. A CPU reference chose “box” too. The older HIP executable chose “fridge”, and all six ROCm CLI diagnostics matched it, but the identity correction above prevents treating those results as policy qualification.

Both automated paths now require one explicit reference device for the tested backend: Metal for Metal, Vulkan for Vulkan, and ROCm for ROCm. Missing, duplicate, CPU-only and cross-backend selectors fail. Reports record the reference backend, and aggregation verifies it. Cross-backend comparisons remain diagnostics; the token agreement and near-tie limits are unchanged.

Unicode and recovery probes#

The initial Vulkan starter row failed the literal Unicode echo requirement. With the generic assistant prompt, ZINC replied ☕ 东京咖啡 🚀; llama.cpp also rephrased the request. Increasing the output budget did not change that behavior. Main's explicit copy-task system prompt addresses this probe while preserving the required Latin, Japanese and four-byte characters. The original failure is retained rather than relabelled a pass.

Fresh tests must also use main's stronger active chat-stream cancellation and EOS checks. The earlier raw-route disconnect did not prove an active streaming generation was cancelled. An old package's green result cannot certify changed executables or the stronger harness.

Regression coverage and release scope#

CPU lifecycle tests exercise candidate and readiness entrypoints with a stable reference, a stale server version, a wrong native backend, and a library-only change. They verify failure reports and reservation cleanup without GPU work. Separate checks cover inherited environments, process-specific library paths and malformed aggregation evidence. Negative controls reject omitted identity and backend checks.

All GPU activity in this audit ran on the remote R9700 with one model process at a time. Every owned process was stopped and reaped before its command ended. The unsigned previews and diagnostic reports do not qualify a signed candidate. The release readiness plan tracks the current worker, signing and nine-profile requirements.